Farms and farmhouses
Large, often stone-built houses off the gas grid, usually on oil or LPG, sometimes with outbuildings or workshops that need heat too.
Heat pumps, cascade systems, hybrid heating and solar with battery storage for farms, estates, holiday lets, hospitality and community buildings across Scotland.
Any building in Scotland with a real heating bill and a reason to move off oil, LPG or old electric heating. These are the sites we are most often asked about.
Large, often stone-built houses off the gas grid, usually on oil or LPG, sometimes with outbuildings or workshops that need heat too.
Several properties on one site, from the main house to cottages and estate offices, where one plan can cover every building.
Heating and hot water that must cope with full occupancy on changeover days and sit quietly at low demand between bookings.
High, steady hot water demand and many rooms, where a cascade of units keeps comfort up and spreads the load.
Daytime heating schedules that suit heat pump controls, and roof space that often suits solar PV.
Large rooms and term-time patterns, where heat loss and controls matter as much as the heat source.
High ceilings and intermittent use, where the survey decides whether a heat pump, hybrid or electric option suits best.
Workshops and units where space heating, hot water and electricity use can be planned together.
The system is chosen to fit the building's heat loss and how it is used, from a single larger heat pump to several working together.
Higher-output units sized to the measured heat loss of the whole building, not a rule of thumb.
Two or more heat pumps linked to work as one, switching on in stages as demand rises, with built-in resilience.
A heat pump working alongside an existing boiler, where the building or the budget is not ready for a full switch.
Cylinders sized for peak demand, from a single farmhouse to a hotel with many bathrooms.
Panels and a battery to supply part of the electricity a heat pump uses, cutting what you buy from the grid.
There is no single figure. Running cost comes from the building, the system design and the price of energy, and the site survey works it out for your property.
How much heat the building loses on a cold day sets the size of the system and most of the running cost.
Better insulated walls, roofs and floors mean a smaller system and lower bills. Sometimes insulation should come first.
The cooler the water the system can run at, the more efficiently a heat pump works. Radiator and pipe sizes decide this.
What you pay for oil or LPG today, including delivery and tank upkeep, is the figure any comparison starts from.
Business and time-of-use tariffs change the cost of every unit of heat a heat pump produces.
Electricity generated on site and stored in a battery reduces how much you buy at the tariff price.
Four stages, with nothing booked until you have the design and quotation in writing.
A no-obligation visit to measure the building, check the fabric, electrics and existing system, and agree where equipment could go.
A system designed to the measured heat loss, with the equipment named and the trade-offs of each option stated in writing.
We install through MCS-certified partners, planned around your business so disruption is kept to a minimum.
Commissioning, a handover of the controls for whoever runs the site, and servicing afterwards.
Yes, provided the system is sized to the building's measured heat loss. Larger farmhouses and rural buildings often need a bigger unit or two units working together in cascade. Older stone buildings may need insulation work or larger radiators first, and the site survey tells you which applies before any design is drawn up.
A cascade system links two or more heat pumps so they work as one. Units switch on in stages as demand rises, which suits buildings with large or changing heat loads such as hotels, schools and halls. If one unit needs servicing, the others keep running and the building keeps its heat.
It depends on the building, not the technology alone. Running cost is decided by heat loss, insulation, the flow temperature the system runs at, your electricity tariff and what you pay for oil or LPG today. Pairing with solar PV and a battery can lower it further. The survey works this out for your site.
Yes, when the hot water cylinder is sized for peak demand rather than average use. Holiday lets and hotels often have many showers running at once on changeover days or busy mornings, so the design accounts for occupancy, the number of bathrooms and recovery time. Larger sites may use more than one cylinder.
We install through MCS-certified partners. After the site survey and heat loss assessment, the system is designed for your building, installed, commissioned and explained to whoever runs the site. Aftercare covers servicing and a named contact for questions, so you are not left working out the controls alone after handover.
Tell us about the building and how it is heated today. We call back to arrange a no-obligation site survey and heat loss assessment.